Redefining the construction industry with innovative solutions, cuttin-edge technology and sustainable practices

Address

Email Address:
needhelp@gmail.com

Project Description

Interior Materials
Okume plywood ceilings and walls and oak flooring
Location
Santo Tomás, Menorca, España
Year
2022
Surface
58,5 M²
Number of Modules
2 Modules De 3×9,80M
Facade Materials
Facade plastered with white stone paint

COMFORT KIT MODEL

1000€ m2
COMFORT KIT MODEL

The SIP COMFORT House includes the following finishing materials:

  1. Exterior walls: Eco-SIP panels of 174 mm with PPS-20 (EPS) polystyrene insulation.
  2. Floor: Coating of choice: Ceramic tiles, Laminate flooring (valued up to €19).
  3. Exterior roof: Eco-SIP panels of 174 mm with PPS-20 (EPS) polystyrene insulation.
  4. Between floors: Wooden beams of 220 mm, Mineral wool of 200 mm, OSB-3 with 15 cm thickness.
  5. Interior walls: SIP panels of 124 mm with PPS-20 (EPS) polystyrene insulation.
  6. Interior wall decoration: Plasterboard panels installed on a structure, finished and painted.
  7. Interior ceiling decoration: Plasterboard panels installed on a structure, finished and painted.
  8. Room finishing: Installation of flooring, laminate parquet or ceramic tiles.
  9. Doors: Entrance doors made of high-quality metal for greater durability and security. Interior doors made of MDF.
  10. Windows: High-quality PVC windows with triple glazing for better thermal and acoustic insulation.
  11. Bathroom and kitchen decoration: Wall and floor coverings that meet resistance and moisture requirements. Finished installation of sanitary ware, faucets, sinks, showers, and bathtubs.
  12. Electricity: Wiring with switches, sockets, and electrical panel. Proper installation of the electrical network using reliable materials.
  13. Facade coating: Exterior plaster with white cement mortar finished with two layers of moisture-resistant paint.
  14. Roof: Tile or similar coating.
  15. Heating: Installation of Aerothermal system and underfloor heating.
CONDITIONS OF CONTRACTING
  1. 5% Down Payment Development of projects in SIP panels
  2. 35% Production 5-10 days before starting the production of SIP panels. Production time for a KIT is 30-40 working days
  3. 20% Completion of Manufacturing and Delivery of KIT. Before the delivery of the house KIT to the site
  4. 20% Assembly and Installation. After installing the house KIT (assembly time 30-50 days)
  5. 10% Progress 50% of construction. The work reached 50% completion (30-50 days)
  6. 10% Finished. Once the work is completed
WARRANTY
  • 1 year for defects in finishes.
  • 3 years for defects affecting habitability.
  • 10 years for defects affecting the structural safety of the property.

SYR Model Gallery #1

SYR Model Plan #1

More Projects

BASIC KIT MODEL
Modulares S&R

BASIC KIT MODEL

COMFORT KIT MODEL
Modulares S&R

COMFORT KIT MODEL

Contact Us

icono whatsapp